Client: Berkeley Homes
Contractor: St George
Location: Imperial Wharf, London
Duration: 125 weeks
Value: £1.775m
We were commissioned to design, fabricate, finish and install architectural metalwork, bolt on balconies and internal balustrades for Chelsea Creek, an extension of Canary Wharf.
Chelsea Creek is one of London’s newest and fashionable waterside developments and as such, we needed to deliver a solution in keeping with its surroundings, for one, two and three bedroom apartments and penthouses on the 40-acre site overlooking the river.
The project included us designing and installing:
Our biggest challenge with this project was to ensure we delivered it on time, within budget, safely and that it also adhered to the very high quality expected of properties that are valued at up to £6.3 million.
Meeting key milestones was another challenge, and we accomplished this by making sure we worked closely with all other trades to secure timeslots with the tower crane and to gain access to the site at the right times.
The design and installation of our bespoke products met the design brief, which included attending weekly site coordination meetings to ensure safe delivery and installation of: